只用一本书提高英语听力能力!重温经典名著双语阅读小编推荐:跟着纪录片学英语不背单词和语法,轻松学英语
返回列表 回复 发帖

[All-In-1-Min] 【整理】2010-07-20 Reuters Video News

提高英语听力能力 找对方法很重要!

[All-In-1-Min] 【整理】2010-07-20 Reuters Video News



   All-In-1-Min-2010-07-20

  Dreamliner shows in Europe











 

 

 

【电信1】: (MP3)   (RM)
【电信2】: (MP3)   (RM)
【网通1】: (MP3)   (RM)
版主提示:

一、若是自己的听写稿且非头贴, 请发帖时标注"Homework".

二、若是改稿, 请发帖时标注"on 某某人"并在修改处标红(按阶梯式改稿).

三、请用Verdana 3号字体.

四、若在听写和理解过程中遇到困难,请到
Special版Q&A提问。



shuangsila在 整理的参考文本:
Boeing's new 787 Dreamliner makes its first trip outside the United States. The Dreamliner No.3 will never see passenger service though. It's the last of three test planes.

Boeing calls the Dreamliner--touching down in the UK for an airshow--a super-efficient airplane. The company says it will use 20% less fuel than similarly sized airplanes. It uses lightweight materials and an innovative design that have impressed the airline industry.

Flight testing has been going slower than expected after its inaugural run last December. Deliveries to its first customer in Japan have been delayed due to production problems.

Andrew Bossone, Reuters.

shuangsila在 整理的生词:
lightweight: adj. having relatively little weight 轻量的,薄型的

innovative: adj. being or producing something like nothing done or experienced or created before 创新的

inaugural: adj. occurring at or characteristic of a formal investiture or induction 就职的,开幕的


下载LRC文件

普特在线文本比较普特在线听音查字普特在线拼写检查普特文本转音频

C'est La Vie~
HOMEWORK

Boeing's new 787 dream liner makes its first trip outside the United States.
The dream liner NO.3 were never serve passengers service though,it's the last of three test plane.Boeing calls the dream liner, touching down in the UK for an air show,a super affection airplane.
The company says it use 20% less fuel than similarly side airplanes,it uses light way materials and individual disign,that've impressed air lining industry,flight test has been going slower than expected after it's in an argue wrong last december,delivery to its first customer in Japan have been delayed due to production problem.
1

评分次数

  • shuangsila

立即获取| 免费注册领取外教体验课一节

[Homework]2010-07-20 Reuters Video News

Boeing's new 787 dream liner make its first trip outside the United States.The dream liner No.3 will never see passenger service though.It's the last of three test planes.Boeing calls it's a dream liner,touching down in the  UK for an air show, a super official air plane.The company says it will use 20% less fuel than similar sizes their planes.It uses lightly materials and an individual design that have been pressed the air lining industry.Flighting test has been going slower than expected after its in argue run last December,delivery to its first customer in Japan has been delayed due to production problem.
This post was generated by put listening repetition system,  Check the original dictation thread!
1

评分次数

  • shuangsila

实现无障碍英语沟通
Homework
Boeing's new 787 dreamliner makes its first trip outside the United States. The dreamliner number 3 will never see passenger service though. It's the last of three test planes. Boeing calls it dreamliner touching down in the UK for an airshow, a super official airplane.
The company says it will use 20% less fuel than similarly-sized airplanes. It uses lightway materials and individual design that have been impressed the air-liner industry. flight testing have been going slower than expected after its wrong last december. Deliveries to its first customer in Japan have been delayed due to production problem.
1

评分次数

  • shuangsila

口译专员推荐—>口译训练软件IPTAM口译通
Homework


Boeing's new 787 Dreamliner makes its first trip outside of the United States. The Dreamliner number three were never seen passenger service though its the last of three test planes. Boeing calls the Dreamliner touching down in the UK for an air show. The super-efficient airplane, the company says, would use 20% less fuel than similarly-sized airplane. It uses light materials and it innovated design has impressed the airline industry. Flight testing has been going slower than expected after its inaugural run last December. Delivery to its first customers in Japan has been delayed due to production progress.
1

评分次数

  • shuangsila

Boeing's new 787 dreamliner made its first trip outside the United States.
The dreamliner No.3 were never seen passager service, so it's the last of three test planes.
Boeing calls the dreamliner * UK for an air show, a super-official airplane.
The company says it will use 20% less fuel than similarly-size airplanes. It uses light-weight materials and innovative designs that impress the airline industry.
Flight testing has been going slower than expected after * last December. Delivering its first two customs in Japan had been late due to production problem.
1

评分次数

  • shuangsila

[Homework]2010-07-20 Reuters Video News

Boeing news 787 dream waner made its first trip outside the United States.
The dream wainer no.3 would never see passenger services though it's the last of 3 test planes.Boeing calls the dream waver touching down the UK for an air show, a superion fishing air plane.The company says it would use 20% less fuel than similarly size air planes.It uses lightly materials and in a notive designed that it impressed airline industry.
3 testing has been going slow than expected after it's an ordinary run last December.Delieverying the first customer to Japan has been delayed dued to production problems.

This post was generated by put listening repetition system,  Check the original dictation thread!
1

评分次数

  • shuangsila

实现无障碍英语沟通

[Homework]2010-07-20 Reuters Video News

Boeing's new 787 Dream Liner makes its first trip outside the United States. The Dream Liner No.3 will never seen the passenger service though is the last of three test planes. Boeing calls the Dream Liner touching down the UK for an air show, a super offician airplane. The company says it will use 20% less fuel than similarly size airplanes. It uses light weight materials and innovative design that impress the air liner industry. Flight testing has been going slower than expected after its in argue run last December. Delivery to its first customer in Japan has been delayed due to production problems.
This post was generated by put listening repetition system,  Check the original dictation thread!
1

评分次数

  • shuangsila

普特听力大课堂
HW
Bowing’s new 787 dreamliner makes its first trip outside the United States. The dreamliner NO.3 were never seen passenger service though it’s the last of 3 test planes. Bowing calls the dreamliner touching down in the UK for an air show, a super efficient airplane. The company says it was used 20% less fuel than similarly size airplane. It uses lightly materials and enervative design that it has impressed the airline industry. Flight testing has been going slower than they expected after its inaugural run last December, deliveries to its first customer in Japan have been delayed to the production problems.
1

评分次数

  • shuangsila

好栏目推荐之美国口语俚语
HW:
Boeing'S new 787 dream liner makes its first trip outside the US.the Dream liner Num.3 were never see passenger services though it is the last of three test plan.
boyin calls the dream liner touching down in the UK for an air show as super-efficient airplane.the company says it will use twenty percent less fuel than similary size airplane.it uses light weight material and innovative design that * impressed the airline industry .fly testing has been going slower than it's  respected after it orgul run last december .Delivery it's two first coustum in japan been delay due the production problems .***
1

评分次数

HW

Boeing's new 787 dreamline makes its first trip outside the United States.The dreamliner No.3 will never see passager service though. It is the last of the three test planes. Boeing calls its a dream liner, touching down the UK for air show.A super offician air plane. The company says it will use 20 percent less fuel than similary sized air planes. It uses light weight materials and innovative design that impress the air line industry. Flight testing has been going slower than expected after its in argue run last Decemer.The delivery to its first customer in Japan has been delayed due to the production problems.
1

评分次数

[Homework]2010-07-20 Reuters Video News

Boeing's new 787 Dreamliner makes its first trip outside the United States.  The Dreamliner No.3 would never serve passengers service though.  It's the last of 3 test planes.    Boeing calls the Dreamliner touching down in the UK for an air show, a super affection air plane.  The company says it will use 20% less feul than similarly size air planes.  It uses light way materials and an innovative design that impressed the airline industry.   Fight testing has been going slower down than expected after its inargural run last December. Delivery to its first customrs in Japan have been delayed due to  the production problems.  
This post was generated by put listening repetition system,  Check the original dictation thread!
1

评分次数

每天半小时 轻松提高英语口语
Homework 20th July 2010
Boeing's new 787 Dream Liner makes its first trip outside the Unit States. The dream Liner number 3 will never see passengers service though it’s the last of three test planes. Bowing calls the dream Liner touching down UK for an air show. A super-efficient airplane. The company says it will use 20% less fuel than similarly size airplanes. It uses lightweight materials and innovative design and even impresses the airline industry. Flight testing has been going slow than expected after it's in argue run last Dec. Delivery to its first customer in Japan had been delayed due to the production problem. xxx xxx Reuters
1

评分次数

  • shuangsila

HW 这几天每天在家里呢 明天开始教小朋友去啦 哈哈
Boeing's new 787 Dreamliner makes its first trip outside the United States. The Dreamliner No. 3 will never see passenger service though.It's the last of three test planes. Boeing calls the Dreamliner touching down in the UK for an airshow, a super-efficient airplane. The company says it will use 20% less fuel than similarly sized airplanes. It uses lightweight materials and an innovative design that have been impressed the airline industry. Flight testing have been going slower than expected after its inaugural run last December. Deliveries to its first customer in Japan have been delayed due to production problems.

Andrew Bossone, Reuters.
1

评分次数

  • shuangsila

【 曼珠华沙 ,彼岸花 】
有花不见叶,叶生不见花,生生世世,花叶两相错,相念相惜却
不得相见,独自彼岸路

我的围脖 http://weibo.com/1743803540/profile/
口译专员推荐—>口译训练软件IPTAM口译通

[Homework]2010-07-20 Reuters Video News

Boeing's new 787 dream liner makes its first trip outside United States. The dream liner number 3 will never see the passenger service though its the last of three test planes. Boeing calls the dream liner touching down the UK for an air show,a super official airplane.The company says it will use 20% less fuel similarly size the airliner. It uses light weight materials and innovative design that inpress the air liner industry. Flight testing has been going slower than expected after its in argue run last December. Delivery to its first customer in Japan has been delayed due to production problems.



This post was generated by put listening repetition system,  Check the original dictation thread!
1

评分次数

返回列表